Cash-Flow Projection
Cash flow 6 months ahead: payroll and loan installments as fixed costs, the rest forecast from past trend. See a cash shortfall before it happens.
ERP · Pre-Accounting · Cash Management
The ArchiNord ERP Module brings every money movement into one flow — from cash to bank, from subcontractor progress payments to customer collections, from cheques and notes to loans. With a 6-month cash-flow projection, per-project budgets and multi-company consolidation, you keep a finger on the firm’s cash pulse at all times.
Cash Summary
Megapol Group · consolidated
Net Position
₺52,7M
Total Liquidity
₺8,2M
Open Receivables
₺66,2M
Monthly Installment
₺673K
6-Month Cash Projection
Closing balance · ₺M4,97
Apr
1,57
May
2,97
Jun
5,57
Jul
9,57
Aug
14,47
Sep
From cash to consolidation, from progress payments to their cash impact — connected modules built for construction’s financial flow.
Cash flow 6 months ahead: payroll and loan installments as fixed costs, the rest forecast from past trend. See a cash shortfall before it happens.
Subcontractor, supplier, customer and staff accounts in one place; statements, trial balance and official/unofficial split.
Portfolio, due-date calendar, endorsement and collection tracking. Instruments nearing maturity raise automatic alerts.
Progress payment calculation (withholding, retention, social-security offset) plus field score for physical–financial progress.
Multi-account bank and cash, foreign-currency support, limit control and end-of-day close.
Request-to-order flow, sealed tender and bid comparison for the best sourcing.
Compare per-project budget with actual spend and income; see profit and variance instantly.
Multi-company management, inter-company transactions and a group-wide consolidated financial report.
Role-based access and approval limits, a lossless audit log; every action is tracked with who and when.
From finance to procurement, from subcontractors to assets and people, from group consolidation to audit — every financial process is run by 30+ interconnected modules.
Payroll and loan installments are treated as fixed costs, while past trend is the forecast. Switch the scenario; the closing balance and any shortfall recalculate instantly.
Current Cash
End of 6 Mo.
Lowest Month
Scenario
Month-End Closing Balance
Cash shortfall detected. Lowest month — plan a bridge loan or accelerate collections.
| Month | Opening | Income | Expense | Closing |
|---|---|---|---|---|
Spend is gathered automatically from the cash, bank, progress-payment and payroll modules. Income comes from collections and rent. Budget and actual sit side by side — a variance above 10% raises an alert.
Budget
85M
Spent
52,3M
Income
48,2M
Budget
120M
Spent
18,5M
Income
19,2M
Budget
32M
Spent
28,1M
Income
26,8M
Current Accounts
Cheque / Note Due Dates
18
Matched
4
Unmatched
85%
Auto-Match
Subcontractor, supplier, customer and staff accounts on one screen; statements and trial balance with an official/unofficial split. The cheque-note portfolio lands on the due-date calendar. Upload a bank statement and the system reconciles in seconds with three-way matching (bank + cash + ledger).
Each subcontractor’s physical progress sits next to its contract/payment ratio. Progress payments are calculated automatically with withholding, retention and social-security offsets. The field score rates quality 0–100, and low-scoring subcontractors raise a flag.
Mert Yapı
Structural
Field Score
88
Pending
₺320K
Ege Mekanik
MEP
Field Score
82
Pending
₺180K
Atlas Alüminyum
Facade
Field Score
71
Pending
₺0
Deniz Boya
Paint / Plaster
Field Score
—
Pending
₺0
Consolidated · All Companies
Receivable
₺66,2M
Payable
₺21,9M
Net
₺52,7M
Pending Approvals
7Audit Trail (Audit Log)
Manage several companies from one panel; switch company and see a group-wide consolidated report. A role-based approval flow runs by amount limits. Every action is recorded with who, when and from which device in a tamper-proof audit trail.
It integrates with banking, alerts, data capture and statutory accounting. Each integration ships with a setup and “how-to” guide in the panel.
Manage approvals, cash position and field expenses from your pocket. The app ships on iOS and Android under your own company name, logo and colors — the brand stays yours.
ArchiNord · ERP
Liquidity
₺8,2M
Approvals
7
Mert Yapı · Progress Pmt
₺850K · Urgent
ST-039 Steel
Order · ₺1,1M
Field exp.
Fuel · ₺4,2K
Let’s set up the ERP Module around your firm’s structure. We’ll start with a short demo.